Case studies

Case studies

For more detail about the work we do and the breadth of our experience and capabilities take a look at these case studies of some of our projects.

Indonesia: Urban infrastructure transport (BRT) development and financing advice (2012)

View case study >

Laos/Thailand: Power transmission interconnection project (2011–2012)

View case study >

Micronesia: Power sector development projects in renewable solar and wind energy (2010)

View case study >

Bangladesh: Development of transport corridors for trade facilitation (2010)

View case study >

Adelaide, South Australia: Desalination project (2009–2010)

View case study >

Dhaka: Financial modelling of Dhaka Water Supply and Sanitation Authority (Dhaka WASA) water utility for the Mirpur Area (2008)

View case study >

China: ATRIUM project development facility to facilitate PPP projects in the water sector (2007)

View case study >

Tajikistan/Afghanistan: ADB regional power transmission interconnection project (2006)

View case study >

Cambodia/Vietnam: Assessment of private sector participation projects and opportunities in the water supply, wastewater and solid waste management systems (2005)

View case study >

Pathum Thani, Thailand: Water treatment (BOOT) project (2001–2003)

View case study >

Ho Chi Minh City: Water supply project – Phase 1 (1999)

View case study >

Ballarat, Victoria: Water treatment plant (1998–1999)

View case study >

West Bangkok: Water treatment plant and distribution system through PPP (BOOT) arrangement (1997–2003)

View case study >

Virginia, South Australia: Wastewater recycling scheme (1996–1997)

View case study >

Acquisition of Anglian Water, 2003

View case study >

Latest news:

Appointed as financial consultant to 500kV Power Transmission Project in Laos

TMP Consulting was engaged by the Asian Development Bank (ADB) in May 2013 to provide financial advice for a shared 500 kV export-driven Power Transmission Facility in Nabong, Laos. TMP  was engaged to develop an equitable commercially viable cost sharing arrangement that will enable various hydropower plants to concurrently use the facility to export power to Thailand. The proposed […] Read More >

TMP Consulting on Australian Government’s Clean Energy Advice Panel from 2012-2015

TMP Consulting has been appointed to the Australian Government’s Clean Energy Advice Panel that provides expert independent advice for financial and commercial, economic and technical and engineering areas of proposed clean energy projects. The appointment is for a period of 3 years from 2012-2015. TMP’s role is to undertake financial and commercial assessments of clean […] Read More >

Infrastructure Financial Specialist for Urban Transport Projects in Indonesia

TMP Consulting provided specialist financial consultancy advice for urban transportation projects in 3 cities in Indonesia during October 2012 – January 2013. The objectives of this consultancy are to further explore the possible Public and Private financing options for urban transport investments identified through Pre-Feasibility Studies in Palembang, Surakarta and Yogyakarta and to work towards […] Read More >

Appointed Financial Consultant for power distribution project in Myanmar

In July 2013, TMP Consulting was appointed as financial consultant for the rehabilitation and expansion of power distribution networks in Yangon, Mandalay and other key high demand cities in Myanmar. The assignment involved working with the Ministry of Energy and Planning (MOEP), Yangon Electricity Supply Board (YESB) and Electricity Supply Enterprise (ESE) in Myanmar. TMP […] Read More >

VIEW SOME OF OUR CASE STUDIES:

For more detail about the work we do and the breadth of our experience and capabilities take a look at these case studies of some of our projects.

View our extensive case studies section >